News

< Back

April 2007 - Liverpool Hospital Improvement

Respol undertook a 66m2 project at the Children’s Hospital, Alder Wey, for the Royal Liverpool NHS. The contract was completed over a weekend.

Situated in the mortuary, the brief was understandably for a sensitive and compassionate fitting, as part of a general improvement of the facility. After preparing the substrate, Reefloor EL002 SF was installed.

 

before after

before & after

 

 

select an application
Health & Safety
Industrial
Food & Pharmaceutical
Chemical
Decorative Systems
Specialist

ISO9001:2000

FERFA MEMBER

ABLE TO OFFER THE WHOLE RANGE OF TODAY'S FLOORING TECHNOLOGIES

SINGLE SOURCE UNCOMPLICATED WARRANTIES

FREE OF CHARGE AND NO OBLIGATION SURVEY AND RECOMMENDATIONS

VAST COLOUR RANGE ANY FROM BS4800, RAL OR PANTONE

 

The essential factors for success are:

• The right surface preparation

• The right material

• The right people to do the job

 

 

Quality Assured - ISO 9001:2000         FeRFA - The Resin Flooring Association

Introduction Preparation Technical
Industrial Food & Pharmaceutical Chemical Decorative Systems Specialist Health & Safety
Industrial Food & Pharmaceutical Chemical Decorative Systems Specialist Health & Safety